Deploy to Prod Systems
Depends on #445 (closed)
Only complete this issue if the QC from #445 (closed) is acceptable.
- Remove a node from Route53 DNS such that it receives no traffic.
- Deploy application to the removed node
- Perform full data load
- Run QC and verify accuracy/functionality
- Return node to Route53 DNS.
Repeat above steps for second production node.