Open
Milestone

Assign hydrologic units to current stream flow sites

User story:

As a watershed manager, I need to view stream flow data for my watershed and not just a single site or state, so that I can see the connections between waterbodies.

Task:

1- To assign real-time surface water sites to hydrologic units codes at various HUC scales from HUC2 to HUC8. 2- Enable plotting of HUC polygons on a map. The data should be in a format that is directly usable for calculations.

Possible extensions based on scope and user needs:

  • Ensure formatting of data for direct use in plotting
  • Test whether site per HUC basins are more complete when querying streamflow from NWIS vs. WQP.
  • Work items 0
  • Merge requests 0
  • Participants 0
  • Labels 0
Loading
Loading
Loading
Loading
0% complete
0%
Start date
No start date
None
Due date
No due date
0
Work items 0
Open: 0 Closed: 0
0
Merge requests 0
Open: 0 Closed: 0 Merged: 0
0
Releases
None
Reference: water/computational-tools/surface-water-work%"Assign hydrologic units to current stream flow sites"