Brad mod
- Added K-Distribution Plot to Output Worksheet
- Verified the actual and 3-casing volume purge times and added 90% purge time lines for HF=1 & HF=x scenarios to the Aquifer Fraction Graph
- Added purge time lines to the Travel Time to Pump Graph. Couldn't use shading as requested so simply added the lines behind the other chart series so they didn't overlap
- Added input cell for pump tubing diameter, applied shift to purge times for Aquifer Fraction Graph based on the volume in the mixing zone and pump tubing given the input flow rate, and made a data label on the Aquifer Fraction Graph to display the time delay
- Added a Legacy folder in the CODE folder to hold old versions of PAT
After merged, the example files may need to be updated to reflect the additions from this version